Inspecting The Levelling Screw - ABB IRT 710 Product Manual

Table of Contents

Advertisement

4 Maintenance

4.3.4 Inspecting the levelling screw

4.3.4 Inspecting the levelling screw
Location of levelling screw
The leveling screw are located as shown in figure.
xx2200000628
Required equipment
Equipment, etc.
Visual inspection
Inspecting the levelling screw
Use this procedure to inspect the leveling screw.
1
Continues on next page
190
Action
Check the M16 chemical anchor bolts for
any loosen.
If any loosen is detected, retighten
it.
© Copyright 2023 ABB. All rights reserved.
Article number
-
Note
Tighten torque:
80 Nm (Chemical anchor bolts directly
connected to the foundation)
308 Nm (M16 bolts connected to the floor
plate)
Note
Product manual - IRT 710
3HKA00000186299-001 Revision: B

Advertisement

Table of Contents
loading

Table of Contents