ABB IRT 710 Product Manual page 331

Table of Contents

Advertisement

2
3
4
5
6
7
8
Product manual - IRT 710
3HKA00000186299-001 Revision: B
Action
Refit the movable chain end to the bracket and
secure with screws.
Refit the movable chain end with bracket to the
cable chain.
Note
Be careful with the cables routing.
Refit the cable chain link besides the movable
chain end.
Refit the plastic link bars.
Refit the movable chain end bracket with cables
to the carriage and secure with screws.
Pull the cables out and route the cable in the
movable chain end.
Fix the cables with straps on the cable chain ac-
cording to the photo taken before the replacement.
© Copyright 2023 ABB. All rights reserved.
5.4.2.6 Replacing the cables in cable chain
Note
xx2200000885
Screws: ISO 4762 M6x20 Class 8.8
(4 pcs)
Washers: BN 792 M6 Washer (4
pcs)
Tightening torque: 10 Nm
Replacing the inner cable chain link
on page 295
Replacing the outer cable chain
link on page 288
xx2200000882
Screws: ISO 4762 M12x35 Class
8.8 (2 pcs)
Washers: BN 792 M12 Washer (2
pcs)
Tightening torque: 83 Nm
Continues on next page
5 Repair
Continued
331

Advertisement

Table of Contents
loading

Table of Contents