ABB IRT 710 Product Manual page 126

Table of Contents

Advertisement

3 Installation and commissioning
3.4.7.1 Assembling the sections
Continued
20
21
22
23
24
Continues on next page
126
Action
When the alignment is correct, tighten the screws
one by one, after applying Loctite 243 on their
thread.
Use a brush to lubricate the racks.
CAUTION
Release the carriage brake and push the carriage
manually along the length of its stroke.
Check that the cable chain lies in the centre of
the track and does not collide with any other fixed
parts.
See section
Releasing the brake on page 117
instructions on how to release the motor brake.
Secure the cover bracket at the joints with two
screws(A) .
Refit the screw(B) and nut manually and stop
when the screw touches the section.
Tighten the nut.
© Copyright 2023 ABB. All rights reserved.
Note/Illustration
Tightening torque: 43 Nm
for
xx2200001323
A Screw ISO 4762 M8x25
Class 8.8
B Screw ISO 4762 M8x30
Class 12.9
Screws: ISO 4762 M8x25 Class 8.8
(2 pcs)
Washers: BN 792 M8 Washer (2
pcs)
Tightening torque: 25 Nm
Screws: ISO 4762 M8x30 Class
12.9 (1 pcs)
Nut: ISO 4032 M8 Class 8.8 (1 pcs)
Washers: BN 792 M8 Washer (1
pcs)
Tightening torque: 3 Nm
Nut tightening torque: 25 Nm
Product manual - IRT 710
3HKA00000186299-001 Revision: B

Advertisement

Table of Contents
loading

Table of Contents