ABB IRT 710 Product Manual page 124

Table of Contents

Advertisement

3 Installation and commissioning
3.4.7.1 Assembling the sections
Continued
11
12
13
14
15
Continues on next page
124
Action
Assemble the rail to the section with the rail
pressing tool.
Note
There should be no gap between the rail mounting
surface and the section mounting surface.
Tighten the rail with the mounting bolts.
Visually check if the rails are seamlessly connec-
ted. If there is seam existed, push to adjust track
sections and ensure that the gap of seam is 0.2
mm.
When the levelling is satisfying, tighten all the
screws for the connecting plates after applying
Loctite 243 on their thread.
Tightening torque: 305 Nm
Slightly tighten the rail screws and finalize the
horizontal alignment of the IRT 710 as described
in
Geometric alignment of track motion IRT 710
on page
133.
Tip
All linear rails are preassembled on track sections.
Note
Use the rail pressing tool to make sure that the
rails are pushed against the side member mount-
ing surface.
© Copyright 2023 ABB. All rights reserved.
Note/Illustration
xx2200001178
Screws: ISO 4762 M12x55
Class12.9
Tightening torque: 128 Nm ±3%
xx2200001185
Product manual - IRT 710
3HKA00000186299-001 Revision: B

Advertisement

Table of Contents
loading

Table of Contents