ABB IRT 710 Product Manual page 215

Table of Contents

Advertisement

Required equipment
Equipment, etc.
Standard toolkit
Replacing the SMB battery pack
Use this procedure to replace the SMB battery pack.
1
2
3
4
5
6
7
8
9
Product manual - IRT 710
3HKA00000186299-001 Revision: B
Note
There are different variants of SMB units and batteries. The variant with the
3-pole battery contact has longer lifetime for the battery.
It is important that the SMB unit uses the correct battery. Make sure to order the
correct spare parts. Do not replace the battery contact!
Action
DANGER
Turn off all electric power, hydraulic and pneumat-
ic pressure supplies to the robot and for the track
motion.
Position first the carriage in the calibration posi-
tion (align the synchronization gauges).
Switch off the power on the SMB box.
Open the SMB box and locate the battery.
Cut the plastic straps.
Unplug the 2 wires cable from the board and re-
move the battery pack.
Place the new battery pack, plug the connector
on the board, and secure the pack with straps.
Close the SMB box, switch on the power.
Update the revolution counters of the axis.
© Copyright 2023 ABB. All rights reserved.
4.6.1 Replacing the SMB battery pack
Art. no.
-
Note
Turn off all electric power, hydraul-
ic and pneumatic pressure supplies
to the robot and for the product.
4 Maintenance
Continued
Note
Content is defined in section
Standard toolkit on page
372.
WARNING
215

Advertisement

Table of Contents
loading

Table of Contents