ABB IRT 710 Product Manual page 273

Table of Contents

Advertisement

Refitting the racks
Use this procedure to refit the racks.
Refitting the rack
1
2
3
Product manual - IRT 710
3HKA00000186299-001 Revision: B
Action
Refit the rack to the track without
fully tighten.
Use the clamps and mounting block
at the ends of the rack section to
make sure that the racks are pushed
against the mounting surface of the
sections and perfectly aligned with
each other.
When the alignment is correct,
tighten the screws one by one, after
applying Loctite 243 on their thread.
© Copyright 2023 ABB. All rights reserved.
5.3.3 Replacing the racks
Note
xx2200000834
Screws: ISO 4762 M8x40 Class12.9 (12 pcs)
Tightening torque: 43 Nm
Rack clamps: 3HAW107700357
Rack mounting block: 3HAWL000011
xx2200001170
Tightening torque: 43 Nm
Continues on next page
5 Repair
Continued
273

Advertisement

Table of Contents
loading

Table of Contents