ABB IRT 710 Product Manual page 122

Table of Contents

Advertisement

3 Installation and commissioning
3.4.7.1 Assembling the sections
Continued
Qty
1
1
Assembling procedure
The following table describes all necessary steps to achieve a correct assembly
of the IRT 710 track:
1
2
3
4
5
Continues on next page
122
Specific IRT 710 tools
Levelling tool (3HAW107700360)
Tool for levelling screw nut tightening
(3HAW060012015)
Action
Markup on a clean floor for the IRT 710.
Markup also the position of each cross member.
Position the preassembled carriage & track sec-
tion on the floor at the predetermined position.
Linearly position the other preassembled section
beside the section above.
Remove the gear rail and rack at the disconnec-
tion point.
Connect the preassembled sections with screws
not mounted.
© Copyright 2023 ABB. All rights reserved.
Picture
xx2200001172
xx2200001189
Note/Illustration
xx2200000668
Product manual - IRT 710
3HKA00000186299-001 Revision: B

Advertisement

Table of Contents
loading

Table of Contents