ABB IRT 710 Product Manual page 131

Table of Contents

Advertisement

4
5
6
7
8
Product manual - IRT 710
3HKA00000186299-001 Revision: B
Action
Check that the hole is drilled to the correct depth
before setting the anchor, hole depth is correct
when the anchor rod contacts the base of the hole
and the setting depth mark coincides with the
concrete surface.
Push the anchor rod into the drilled hole.
Use the setting tool at a speed of 250-1000 r.p.m
to drive the anchor rod into the hole, applying
moderate pressure and with the hammering action
switched on.
Switch off the rotary hammer drill immediately
when the specified setting depth is reached (refer
to mark on the anchor rod). After setting, adhesive
mortar must fill the annular gap completely right
up to the concrete surface.
CAUTION
Prolonged rotary action may cause mortar to be
forced out of the hole. resulting in reduced anchor
loading capacity.
The working time 't
' which depends on base
rel
material temperature, must be observed. The
screwed-on setting tool may be removed only
after the time 't
' has elapsed.
rel
© Copyright 2023 ABB. All rights reserved.
3 Installation and commissioning
3.4.7.2 Recommendations for floor mounting
Note
xx1700001669
xx1700001670
xx1700001671
xx1700001672
xx1700001673
Continues on next page
Continued
131

Advertisement

Table of Contents
loading

Table of Contents