ABB IRT 710 Product Manual page 311

Table of Contents

Advertisement

Refitting the movable chain end
Use this procedure to refit the movable chain end.
Refitting the movable chain end
1
2
3
4
5
6
Product manual - IRT 710
3HKA00000186299-001 Revision: B
Action
Note
If any part of the cable chain tray has been re-
moved, use Loctite 243 when refitting parts. Also
note that the NYLOC nuts can only be used once.
Refit the movable chain end to the bracket and
secure with screws.
Refit the movable chain end with bracket to the
cable chain.
Note
Be careful with the cables routing.
Refit the cable chain link besides the movable
chain end.
Refit the plastic link bars.
Refit the movable chain end bracket with cables
to the carriage and secure with screws.
© Copyright 2023 ABB. All rights reserved.
5.4.2.4 Replacing the movable chain end
Note
xx2200000885
Screws: ISO 4762 M6x20 Class 8.8
(4 pcs)
Washers: BN 792 M6 Washer (4
pcs)
Tightening torque: 10 Nm
Replacing the inner cable chain link
on page 295
Replacing the outer cable chain
link on page 288
xx2200000882
Screws: ISO 4762 M12x35 Class
8.8 (2 pcs)
Washers: BN 792 M12 Washer (2
pcs)
Tightening torque: 83 Nm
Continues on next page
5 Repair
Continued
311

Advertisement

Table of Contents
loading

Table of Contents