3 Installation and commissioning

3.2 Overview of installation and commissioning procedure

3.2 Overview of installation and commissioning procedure
Installation and commissioning steps
Carry out the following steps after delivery, to install and commission the track
motion IRT 710.
1
2
3
4
5
6
7
8
9
86
Action
Unpack the track motion.
Read through and follow the information
and instructions for on-site installation of
the track motion.
Lift the track motion.
Assemble the track motion.
Assembling the pedestal (option).
Assemble the manipulator.
Electrical installation.
Software installation.
Update the revolution counters.
© Copyright 2023 ABB. All rights reserved.
Reference
Compare the delivery check to the identific-
ation plate and verify for acceptance accord-
ing to
Acceptance inspection on page
Installation and commissioning on page
Lifting track motion using lifting
Assembling the track motion IRT 710 on
page 120
Assembling the pedestal (option) on
page 139
Assembly of the manipulator on page
Electrical installation on page
Software installation on page 172
Updating revolution counters on page
Product manual - IRT 710
3HKA00000186299-001 Revision: B
89.
85.
slings.
141.
143.
342.