FusionModule1000A20 Prefabricated All-in-One
Data Center
Commissioning Guide
Step 3 Perform networking operations on the next iBAT only after networking for the
previous iBAT is successful. Repeat
Step 4 Press the iBOX networking switch for 2 seconds. When the RF_Z indicator on the
iBOX turns from blinking green at super short intervals to blinking green at long
intervals, the networking is complete.
Step 5 (Optional) If multiple iBOXs are cascaded, repeat
networking for remaining iBOXs and iBATs.
----End

9.3.3 (Optional) NetEco Management

9.3.3.1 Basic Operations Before Adding Devices

9.3.3.1.1 IP Address Preinstallation Planning

The IP address must be in compliance with the following requirements:
Table 9-8 IP address list
Item
Server IP
address
Issue 03 (2022-12-15)
NO TE
● It is recommended that iBATs be networked from the positive battery string terminal
according to the battery cable connection sequence.
● Batteries are numbered depending on the sequence of connecting iBATs to the iBOXs.
NO TE
After the networking is complete, if the ALM indicator on the iBOX is steady on, the
number of devices online is smaller than the value of iBAT Number. Check that iBAT
Number is set to a correct value and that the iBAT is successfully networked.
The static IP address must be used.
The IP address must be unique on the live network.
You can plan only one IP address for one network interface. It is not allowed
to plan or set multiple IP addresses for the same network interface.
The NetEco server can communicate with managed devices.
The NetEco server can communicate with Web clients.
NO TE
The subnet mask of all IP addresses is 255.255.255.0.
Preinstallation Setting
192.168.8.11
Copyright © Huawei Digital Power Technologies Co., Ltd.
9 Commissioning Core Components
Step 2
to add other iBATs to the iBOX network.
Step 1
Description
Used for logging in to the NetEco and
the PowerEcho.
to
Step 4
to perform
77