IDS2000 Intelligent Micro-Modular Data Center
Installation Guide (2000 mm High Cabinet in Dual-Row
Aisle Containment)
Step 2 Install an LED light onto the holders, as shown by (2) in
Step 3 Use the same method to install the other LED lights, and connect the first and last lights in the
same row in series, as shown in
Figure 4-135 Installing other LED lights
----End

4.11 Installing Monitoring Devices

4.11.1 Device Layout in the Network Cabling Cabinet

There are multiple types of monitoring components. Make installation plans based on the
configurations.
components for your reference.
Issue Draft A (2015-06-29)
Figure
Figure 4-136
shows the installation positions for some monitoring
Huawei Proprietary and Confidential