Carrying Out A System Reload - Siemens HiPath 3000 Series Service Documentation

Table of Contents

Advertisement

start_h3.fm
Starting Up HiPath 3000
Starting Up HiPath 3800
5.1.3

Carrying Out a System Reload

After supplying the system with power, you must carry out a system reload.
Procedure
The reset/reload switch is tested by a Field Programmable Gate Array (FPGA). This
>
FPGA is loaded by the processor when starting up the HiPath 3800 and is only fully
functional after the loading process is complete. If the reset/reload switch is activated
during loading, then it is not possible to evaluate the cause of the restart. For this
reason, the reset/reload switch may only be activated after the system startup
(green Run LED lights up).
Press and hold down the reset switch for at least 5 seconds (FAIL LED (red) goes out). If you
do not hold down the reset switch for a full 5 seconds, the system may perform a reset rather
than a reload or may not reload properly.
5-6
Nur für den internen Gebrauch
A31003-H3590-S100-7-7620, 06/2012
HiPath 3000/5000 V9, Service documentation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents