For U.s. Only: Connecting Network Facilities - Siemens HiPath 3000 Series Service Documentation

Table of Contents

Advertisement

inst_h3.fm
Installing HiPath 3000
Installing HiPath 3800
4.1.7.4

For U.S. only: Connecting Network Facilities

NOTE
>
Before installing the outgoing lines, the grounding of the system must be ensured.
Connecting to the Point of Demarcation
Most main distribution frames are designed with a network demarcation block. You must cross-
connect the MDF to the incoming trunks. Use a standard wiring tool for laying the cable wires.
Connecting to T1, PRI, or CorNet
NOTE
The DIU2U and DIUT2 boards can only be installed in conjunction with a listed CSU (channel
service unit).
Additional primary protection
NOTE
Danger of damage to property due to surge voltage. Lines from the following boards that exit
the building must be protected with an additional primary protection against surge voltage as
a result of lightning:
DIU2U*
DIUT2*
SLMA / SLMA8
TMC16
TMDID
TMEW2
TM2LP
* When this board is connected to the public network, an additional primary protection must
be provided by the CSU.
4-80
Nur für den internen Gebrauch
A31003-H3590-S100-7-7620, 06/2012
HiPath 3000/5000 V9, Service documentation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents