5.4.5 Next report (system report)

You can set signal time and message cycle in Application [ Parameter Setting ], but not
data point "Next report". See the following information on "Next report".
You want to send a system report every Monday at 06:00. Set the following
parameters:
• Data point "Signal time"
• Data point "Message cycle" = 7 days
However, you parameterize and commission the central communication unit on
Wednesday. Thus: Next report = 5 days, i.e. Wednesday + 5 days = Monday. The
message cycle of 7 days applies from that point onward, i.e. every Monday.
• Select
Applications > Popcard...
• Double-click data point "Next report" to open the dialog box, set the required value
and click
to enter the value.
OK
Note that the parameterized value "Message cycle = 7" first is written to data point
"Next report" and overwritten only by the value setting (example 5).
Commissioning instructions OZW775 V2.01
Further commissioning steps
= 06:00
command sequence: Settings > System report.