Connecting Lines To The External S Patch Panel - Siemens HiPath 3000 Series Service Documentation

Table of Contents

Advertisement

inst_h3.fm
Installing HiPath 3000
Installing HiPath 3800
4.1.7.3.2
Connecting Lines to the External S
24
22
20
23
21
19
8
1
Figure 4-45
Assignment of the S
CABLUs must be manually connected to the S
ne wiring tool for this.
8 7 6 3 2 1 4 5
Pin assignment of MW8 jacks
Twist the wire pairs before laying them.
Figure 4-46
Laying Wire Pairs at the S
4-78
18 ...
17 ...
3 x 8 MW8 jacks, numbering
:
Pin
as a subscriber line
3
Transmit +
4
Receive +
5
Receive –
6
Transmit –
Patch Panel C39104-Z7001-B3
0
Patch Panel
0
... 8
... 7
MW8 jack assignment:
as a trunk connection
Receive +
Transmit +
Transmit –
Receive –
patch panel (Figure 4-46). You can use the Kro-
0
Patch Panel
0
HiPath 3000/5000 V9, Service documentation
Nur für den internen Gebrauch
6
4
2
5
3
1
A31003-H3590-S100-7-7620, 06/2012

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents