Starting Hipath 3800 As A Gateway; Prerequisites; Procedure For Installation And Startup - Siemens HiPath 3000 Series Service Documentation

Table of Contents

Advertisement

start_3g.fm
Starting HiPath 3000 as a Gateway

Starting HiPath 3800 as a Gateway

7.1
Starting HiPath 3800 as a Gateway
7.1.1

Prerequisites

Warning
7
Only authorized service personnel should install and start up the system.
Refer to Section 4.1.1 for information on the tools and resources needed to install the HiPath
3800 system.
7.1.2

Procedure for Installation and Startup

To ensure that IP addresses are not assigned more than once in the customer net-
>
work, you must ping each new IP address to be configured before each IP address
is assigned. If an IP address responds, then this address cannot be used again.
Caution (for Brazil only)
7
The use of the outlet strip with overvoltage protection with part number C39334-
Z7052-C33 is absolutely mandatory. The AC power of the system cabinet(s) must
be conducted through the outlet strip with overvoltage protection.
Table 7-1
HiPath 3800 as a GW, Procedure for System Installation and Startup
Step
Installing HiPath 3800 (19-Inch Cabinet)
1.
Selecting the Installation Site, page 4-20(generally determined by the existing 19-
inch cabinet)
2.
Unpacking the Components, page 4-23
3.
Mounting System Cabinets in the 19-Inch Cabinet, page 4-24
4.
Grounding the System, page 4-27
Checking the Grounding, page 4-30
5.
Connecting the Cable to the Backplane, page 4-51
6.
If required: Inserting the External Patch Panel, Page 4-66
7.
Loading the System Software and Installing Subboards on the CBSAP, page 4-81
8.
Installing Boards (Configuration Notes), page 4-31 (cabinet(s) are already
equipped with the boards)
We recommend that you check the board population using the configuration notes.
7-2
Activity (Remarks)
HiPath 3000/5000 V9, Service documentation
Nur für den internen Gebrauch
A31003-H3590-S100-7-7620, 06/2012

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents