Connecting Workpoint Clients; Making Trunk Connections; Performing A Visual Inspection - Siemens HiPath 3000 Series Service Documentation

Table of Contents

Advertisement

Nur für den internen Gebrauch
4.2.4.10

Connecting Workpoint Clients

For information, see Chapter 10.
4.2.4.11

Making Trunk Connections

Refer to the following board descriptions for information:
STLS4R (S
trunk connection)
0
TS2R, only HiPath 3500 (S
TLA4R (not for U.S.) (MSI)
TMGL4R (for U.S. only)
TST1 (for U.S. only), HiPath 3500 only
4.2.4.12

Performing a Visual Inspection

Before starting up the system, you must perform a visual inspection of the hardware, cables,
and the power supply. The visual inspection must be performed while the system is disconnect-
ed from the power supply.
Caution
7
Conduct the visual inspection only while the system is disconnected from the power
supply.
Always wear an antistatic wristband and observe the measures for protecting elec-
trostatically sensitive devices (see Section 1.2.6, "Notes").
Step
1.
Compare the slots for the
installed boards with the
board assignment map.
2.
Check the local line voltage. Digital multimeter
After finishing the visual inspection, you can begin starting up the system as de-
>
scribed in Chapter 5.
A31003-H3590-S100-7-7620, 06/2012
HiPath 3000/5000 V9, Service documentation
Installing HiPath 3550, HiPath 3350, HiPath 3500, and HiPath 3300
trunk connection)
2M
Activity
Board assignment map
Resources/Remarks
inst_h3.fm
Installing HiPath 3000
Possible remedies
Correct the board
configuration and no-
tify the sales depart-
ment.
4-123

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents