Second Program Area (Fp2Sh, Fp10Sh) - Panasonic FP-E Programming Manual

Fp series
Table of Contents

Advertisement

Precautions Concerning Programs

4.10 Second Program Area (FP2SH, FP10SH)

Explanation of operation method for FP2SH and FP10SH
For the type of FP2SH of which program capacity exceeds 60k steps and for the type
of FP10SH of which program capacity exceeds 60k steps if the memory is added, the
program area is divided into the first program area and the second program area. The
divided programs are separate program units, however, uploading and downloading
with TOOL is performed simultaneously. There are following restrictions for the
operation devices.
Device and function
Bits X, Y, R, LWords WX, WY, WR,
WL, DT, Ld, In, Fl
SALL Subroutine call
SUB Subroutine entry
JP Jump
LBL Label
INT Interrupt program
SSTP Step ladder
MC, MCE Master control
Syntax check
− For SUB, JP, LBL, MC and MCE, the checks are performed as the above
table.
− The duplicated output of OT and KP instructions and the duplicated use of
timer and counter instructions are checked throughout the first and second
programs.
4 - 34
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
First program
Common device
The subroutine of the second pro-
gram cannot be called up.
100
255 (However, jumping to the second
program is not possible.)
255
Can be written in the first program
only.
Can be written in the first program
only.
255 (A pair must be formed in the first
program.)
Second program
The subroutine of the first program
cannot be called up.
100
255 (However, jumping to the first
program is not possible.)
255
Cannot be used.
Cannot be used.
255 (A pair must be formed in the
second program.)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fp0Fp2Fp2shFp0rFrsFp10sh ... Show all

Table of Contents