4.9
Processing During Forced Input and Output
Operation during operation
For small−sized PLCs FP0R, FP0, FPΣ and FP−X
Forced relay R and output Y are rewritten according to the results of operation.
For medium−sized PLCs FP2 and FP2SH
For the relay and output Y specified by OT or KP instruction, the value of the forced
processing has a priority. When rewritten by a high−level instruction, the result of the
instruction has a priority.
4 - 33
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com