Verifying The Upgrade And Configuring The Upgraded Routing Engine; Subsystem; Taking The Host Subsystem Offline - Juniper PTX5000 Hardware Manual

Packet transport router
Hide thumbs Also See for PTX5000:
Table of Contents

Advertisement

Verifying the upgrade and Configuring the Upgraded Routing Engine

Related
Documentation
Upgrading to the RE-PTX-X8-64G Routing Engine in a Nonredundant Host Subsystem

Taking the Host Subsystem Offline

Copyright © 2017, Juniper Networks, Inc.
Configure the Upgraded Routing Engine:
You then switch over this backup Routing Engine to make it the master Routing Engine.
1.
Use the
request chassis routing-engine master (acquire | release | switch)
to switchover the RE1-CB1 to become master host subsystem. All FPCs reboot after
this step.
Replace the Routing Engine RE0 with the RE-PTX-X8-64G Routing Engine.
2.
Use the
request chassis routing-engine master (acquire | release | switch)
3.
to make the Routing Engine RE0 as the backup Routing Engine.
Configure the new backup Routing Engine RE0 by using the
4.
command to copy the configuration to the backup Routing Engine.
PTX5000 Routing Engine Description on page 76
Upgrading to the RE-PTX-X8-64G Routing Engine in a Nonredundant Host Subsystem
on page 417
In a nonredundant host subsystem, only one Routing Engine and one Control Board are
present in the chassis.
To upgrade the existing Routing Engine to the RE-PTX-X8-64G Routing Engine, perform
the following steps.
Taking the Host Subsystem Offline on page 417
1.
Removing the Routing Engine on page 418
2.
Removing the Control Board on page 419
3.
Installing the Control Board CB2-PTX on page 420
4.
5.
Installing the Routing Engine RE-PTX-X8-64G on page 421
Verifying the Upgrade and Configuring the Upgraded Routing Engine on page 422
6.
Before you replace a Routing Engine, you must take the host subsystem offline. The host
subsystem is taken offline and brought online as a unit. Be aware of the effect of taking
a host subsystem offline on traffic, forwarding, and routing. See
Effect of Taking the PTX5000 Host Subsystem Offline" on page
Halt the host subsystem.
To halt the host subsystem use the
1.
user@host> request vmhost halt
Chapter 30: Upgrading to RE-PTX-X8-64G Routing Engines
commit synchronize
"Understanding the
command.
request vmhost halt
command
command
383.
417

Advertisement

Table of Contents
loading

Table of Contents