To power off a PTX5000 with RE-PTX-X8-64G Routing Engines:
NOTE:
After powering on a power supply, wait at least 60 seconds before
powering it off.
On an external management device connected to the PTX5000, issue the
1.
vmhost halt routing-engine both
down the Routing Engines cleanly, so their state information is preserved. See request
vmhost halt in the Installation and Upgrade Guide for more information about the
command.
If the PTX5000 contains only one Routing Engine, issue the
command.
user@host> request vmhost halt routing-engine both
Wait until a message appears on the console confirming that the operating system
has halted.
Initiating vmhost halt... ok
Initiating Junos shutdown...
Shutdown NOW!
ok
Junos shutdown is in progress...
*** FINAL System shutdown message
System going down IMMEDIATELY
...
...
Operating system
halted.
Please press any key to reboot.
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
2.
the strap to one of the ESD points on the chassis.
Move the power switch on the PDU to the off (
3.
Perform these additional steps for your specific PDU:
4.
120-A DC PDU—Switch the circuit breakers on the PDU to the off (
60-A DC PDU—Switch the power input switches on the PDU to the off (
Three-phase delta AC PDU or three-phase wye AC PDU—Switch the circuit breaker
on the PDU to the off (
operational mode command. The command shuts
shutdown: [pid 14318]
***
O
) position.
) position.
O
request
request vmhost halt
) position.
O
) position.