Figure 199: Connecting Grounding And Ac Power Wires To A Three-Phase Delta - Juniper PTX5000 Hardware Manual

Packet transport router
Hide thumbs Also See for PTX5000:
Table of Contents

Advertisement

PTX5000 Packet Transport Router Hardware Guide
324
Connect the wires to the AC terminal block on the three-phase delta AC PDU
7.
(Figure 199 on page
324). Using a 1/5-in. (5.5-mm) slotted screwdriver, loosen the input
terminal or grounding point screw, insert each wire into the grounding point or input
terminal, and tighten the screw.
Insert the wire labeled
a.
Insert the wire labeled
b.
Insert the wire labeled
c.
Insert the wire labeled
d.
Figure 199: Connecting Grounding and AC Power Wires to a Three-Phase
Delta AC Power Supply
Verify that the AC power and grounding wiring connections are correct.
8.
Using a number 2 Phillips (+) screwdriver, tighten the two captive screws on the metal
9.
AC wiring compartment.
Verify that the AC power cord is not touching or blocking access to packet transport
10.
router components, and that it does not drape where people could trip on it.
Reconnect the AC power cord to the power source.
11.
NOTE:
After powering on a PDU, you must wait at least 60 seconds before
turning it off.
GND
into the grounding point.
L1
into the
L1
input terminal.
L2
into the
L2
input terminal.
L3
into the
L3
input terminal.
Copyright © 2017, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

Table of Contents