Installing the Cable Management Comb Assembly with Extension

Copyright © 2017, Juniper Networks, Inc.
Four number 12 or M6 screws to install the comb panel assembly to the rack (not
provided).
Figure 93: Cable Manager for a PTX5000 with High Capacity Power
System
1—
Comb assembly
2—Extension panel—Inside piece
NOTE:
Ensure that while mounting the PTX5000 chassis on the four-post
rack, you leave at least 1.75 in. (4.45 cm) between the bottom of the PTX5000
chassis and the floor, so that there is enough space to install the High Capacity
DC power system and to connect the cables.
To install the comb assembly to the rack:
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to one of the ESD points on the chassis.
Align a cable manager assembly for one PDU against the rack vertically. Move the
2.
comb assembly up or down so that the mounting holes are aligned to the mounting
holes on the rack.
Chapter 21: Connecting the Router to Power
3—
Extension panel—Outside piece
197