FIL- 3.6.0 600 ML/MIN COLLECTED / VERIFY FILLING PROGRAM
a) Reconnect the machine's drain tubing to the station drain!
b) ENSURING Dialysate Flow is on, ENSURE a good drain connection by either 'listening' for drain flow
or visually verifying it!
IMPORTANT! Return the Air Sensor Connector's wires to their probes on top of
c)
Chamber #69 i.e. brown on top; blue on bottom!
d) Set [Dialysate Flow] to 800 ml/min and press 'CONFIRM'!
e) Allow [Conductivity] to stabilize between 13.0 and 14.4 mS.
f)
Call debug screen 0. Allow Valve #24's 'dot' to turn blue.
g) Allow one (1) minute BEFORE continuing to part h.
h) Call debug screen 1. WITHOUT LOOKING AWAY, watch FILACT for to two (2) minutes or until it
EVER = 1 even just once. TWO (2) possible scenarios:
1)
IF (and ONLY if) FILACT EVER = 1: See procedure number
2)
IF FILACT = 0 always: Proceed to
page 431
LEFT BLANK INTENTIONALLY
2008K/K2 Troubleshooting Guide
P/N 507298 Rev. H
FIL- 3.6.2
, procedure number
FIL-
(page 429).
4.0.0.
Page 428