T- 3.0.4 Drain Flow Stopped; T- 3.0.5 Heat Disinfect/Measure 'Actual' Temperature - Fresenius Medical Care 2008K2 Troubleshooting Manual

Hemodialysis system
Hide thumbs Also See for 2008K2:
Table of Contents

Advertisement

Yes
Drain Flow continues! Read this step before performing it! The previous Valve #30
is probably good. The Actuator-Test Board is bad. After replacing the board return to
(ABOVE) procedure number
problem!
No Drain flow stopped! Return to (ABOVE) procedure number
this fixes the temperature problem.

T- 3.0.4 DRAIN FLOW STOPPED

IMPORTANT!
a)
Press 'Escape' then 'CONFIRM' twice to call the "Select Program" screen.
b) Remove the dialyzer lines from the shunt and attach them to a calibrated Temperature (°C) meter*.
* DO NOT USE a Mesa
and most other meters can be used! Refer to the meter's Operator's Manual!
c) Figure right, under the
shunt door locate the
three (3) spring loaded
switches
d) See procedure number
T- 3.0.5
(page 285).
T- 3.0.5 HEAT DISINFECT / MEASURE 'ACTUAL' TEMPERATURE
This procedure simulates the dialyzer connectors in the shunt door to allow the Heat Disinfect Program to
start!
a) With your right hand PUSH IN AND HOLD ALL THREE (3) switches.
b) With your left hand, place the machine in
c) WITHOUT closing the door RELEASE the buttons.
d) The "Cover is Open" banner appears! A "Flow Recirc Error" may occur but MUST go away within forty
five (45) seconds!
e) ENSURING the flow indicator's 'bob' is moving up and down, see procedure number T- 3.0.6 (page
286).
T- 3.0.0
/ PREPARE TO MEASURE 'ACTUAL' TEMPERATURE
NEO-1
®
as it CANNOT measure temperature more than 40°C! The NEO-2
HEAT DISINFECT
2008K/K2 Troubleshooting Guide
P/N 507298 Rev. H
(page 283) to see if this fixes the temperature
T- 3.0.0
.
(page 283) to see if
Page 285

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2008k

Table of Contents