Step # 2: Read before parts a THROUGH e BEFORE performing them:
a) Turn the machine OFF then back on.
b) Return to Dialysis Program with [Dialysate Flow] set to 500 ml/min.
c) Allow six (6) minutes ENSURING [Conductivity] stabilizes to between 13.0 and
14.3 mS.
d) Reset all alarms!
e) Return to (ABOVE)
(and ONLY if) you return here continue to step #3.
Step #3: Read parts a THROUGH e below BEFORE performing them!
a) Perform an Acid Clean per procedure.
b) Return to Dialysis Program with [Dialysate Flow] set to 500 ml/min.
c) Allow six (6) minutes ENSURING [Conductivity] stabilizes to between 13.0 and 14.3
mS.
d) Reset all alarms!
e) Return to (ABOVE)
return here (because "Can't Run OLC Test" reoccurs) proceed to
procedure number
ONLY if) you return here, THREE (3) possible bad components below:
Component List:
1) Power Logic Board; 2) Actuator-Test Board; 3) Functional Board.
page 385
, procedure number
page 385
, procedure number
CO- 6.2.0
to calibrate COND CELLS. After the calibration if (and
LEFT BLANK INTENTIONALLY
2008K/K2 Troubleshooting Guide
P/N 507298 Rev. H
CO-
10.0.405 HOWEVER, if
CO-
10.0.405 HOWEVER, if you
page 354
,
Page 389