4
Remove cards from the CE shelf and store them in a safe place.
5
Tag and disconnect the tape unit alarm connector. To do this, you must
first remove the tape unit and then disconnect the alarm connector.
6
The CE shelf will not be used after the upgrade is completed. You may
remove it now if you wish:
•
Tag and disconnect all alarm connectors from the harness to the CE
shelf.
•
Unplug all power converter cards and all CE cards from the CE
shelf.
•
Tag and disconnect power connections and power monitor
connector C12 from the cabinet power distribution harness to the
right end of the backplane on the QSP39 shelf.
Note: If the cabinet is equipped with an expansion CE shelf (a second
CE shelf), disconnect and remove the wiring between the +5V, +12V,
–12V, and LGND connections on the CE shelf.
•
Tag and disconnect the power connector from the cabinet power
wiring harness to the shelf housing the tape unit or QMM38 Mass
Storage Unit, if equipped.
•
Tape all exposed power leads with electrical insulation tape.
•
Remove the QPC84 Power Monitor and set switches to disable
power monitoring in the CE shelf. A QPC84 Power Monitor vintage
S or later is required. Refer to Circuit card installation and testing
(553-3001-211) for switch setting information.
•
Install the QPC84S Power Monitor.
Upgrade system installation Upgrading to Meridian 1 system options
SL-1 A, M, S, and MS system upgrades
2-35