Nortel Meridian 1 Manual page 48

Upgrade system installation through x11 release 21
Table of Contents

Advertisement

4
Remove cards from the CE shelf and store them in a safe place.
5
Tag and disconnect the tape unit alarm connector. To do this, you must
first remove the tape unit and then disconnect the alarm connector.
6
The CE shelf will not be used after the upgrade is completed. You may
remove it now if you wish:
Tag and disconnect all alarm connectors from the harness to the CE
shelf.
Unplug all power converter cards and all CE cards from the CE
shelf.
Tag and disconnect power connections and power monitor
connector C12 from the cabinet power distribution harness to the
right end of the backplane on the QSP39 shelf.
Note: If the cabinet is equipped with an expansion CE shelf (a second
CE shelf), disconnect and remove the wiring between the +5V, +12V,
–12V, and LGND connections on the CE shelf.
Tag and disconnect the power connector from the cabinet power
wiring harness to the shelf housing the tape unit or QMM38 Mass
Storage Unit, if equipped.
Tape all exposed power leads with electrical insulation tape.
Remove the QPC84 Power Monitor and set switches to disable
power monitoring in the CE shelf. A QPC84 Power Monitor vintage
S or later is required. Refer to Circuit card installation and testing
(553-3001-211) for switch setting information.
Install the QPC84S Power Monitor.
Upgrade system installation Upgrading to Meridian 1 system options
SL-1 A, M, S, and MS system upgrades
2-35

Advertisement

Table of Contents
loading

Table of Contents