26 Connect all cables to the cards (including the NT8D88 cables from the
I/O panels to the NT8D04 Superloop cards). Enable the faceplate
switches.
27 Switch the cables at the PE end:
If NT8D92 cables inside the IPE modules are not connected,
connect them to the faceplates of the appropriate NT8D01
Controller cards.
28 Turn on power to the cabinet:
Set the AC input circuit breaker on the –48V rectifier in the cabinet
to ON.
Set the CAB INP circuit breaker on the power control shelf in the
cabinet and all other shelf circuit breakers to ON.
29 In the option 61C, verify that all cards are enabled (all ENB/DIS
switches are set to ENB).
30 Follow the appropriate step below to restore power in each
Core/Network module.
Note: If power to both Core/Network Modules is restored
simultaneously, the CMDUs should still be synchronized.
For AC-powered systems, simultaneously set the MPDU in both
Core/Network Modules to ON (up position).
For DC-powered systems, simultaneously set the switch on the
module power supply in both Core/Network modules to ON (up
position).
31 Reenter system configuration data into the customer database, if
required, in the following sequence:
Reassign configuration data previously moved from loop 28 to an
appropriate loop in the option 51C, and balance the network loops
between both Core/Network shelves. To do this, do the following:
Define the target loop using the Configuration Program
(LD 17).
Move the loops using the Move Data Blocks Program (LD 25).
Refer to X11 input/output guide (553-3001-400) for instructions on
using LD 17 and LD 25.
Upgrade system installation Upgrading to Meridian 1 system options
Meridian 1 option 21 upgrades
8-135