10-58
Meridian 1 option 61 upgrades
553-3001-250 Standard 14.00 August 1996
9
Press the MAN INT button on the CP card in Core/Net 0. Watch the
initialization process. Make sure the CNI and 3PE cards are
auto-enabled. (The faceplate LEDs should go out.)
Note: If the network loop corresponding to a CNI port is not enabled, the
LED for that port may not go out.
10 Check for dial tone. If there is no dial tone:
Perform a visual check of the core module. Verify that each card is
in the correct slot. Verify that all cards are seated, all ENB/DIS
switches are set to ENB, and all red LEDs are off.
Verify that all cables are properly and securely connected in the
front and rear of the module.
Check the status of the CNI cards with LD 135 "STAT CNI" and
ensure all configured CNIs are software enabled.
If any configured CNI cards are software disabled, test the card with
LD 135 "TEST CNI c s."
If the test is successful, enable the card in LD 135, perform a data
dump with LD 43, and recheck the CNI status in LD 135.
Check for dial tone again.
11 Following a successful dial tone test, perform the following basic sanity
tests:
Make sure calls can be placed.
Check for error messages, line noise, chatter, or other problems.
Track sources and resolve problems as necessary.
The upgrade of Core 0 is complete, and the customer database is converted.
The system is operating in split-mode with call processing on Core 0.