Performing A Data Dump; Splitting The Cpus On The Option 61C - Nortel Meridian 1 Manual

Upgrade system installation through x11 release 21
Table of Contents

Advertisement

Performing a data dump

To provide a safety backup of the customer database, you must perform a data
dump to your current disks:
1
On the 61C system, log into the system.
2
Load the Equipment Data Dump Program (LD 43). At the prompt, enter
LD 43
3
When "EDD000" appears on the terminal, enter
EDD
4
When "DATABASE BACKUP COMPLETE" or "DATADUMP
COMPLETE" appears on the terminal, enter
****
If the data dump is not successful, do not continue; contact your
technical support organization. A data dump problem must be
corrected before proceeding.

Splitting the CPUs on the option 61C

Before beginning the upgrade, you must disable CPU 1. To do this, perform
these steps:
1
In the option 61C, verify that CPU 0 is the active CPU, and switch CPUs
if it is not:
LD 135
STAT CPU
SCPU
****
Upgrade system installation Upgrading to Meridian 1 system options
Upgrades to Meridian 1 option 81
to load the program
to begin the data dump
to exit the program
CAUTION
to load the program
to get the status of the CPUs
to switch CPUs (if required)
to exit the program
12-13

Advertisement

Table of Contents
loading

Table of Contents