Nortel Meridian 1 Manual page 27

Upgrade system installation through x11 release 21
Table of Contents

Advertisement

2-14
SL-1 A, M, S, and MS system upgrades
553-3001-250 Standard 14.00 August 1996
Remove the QPC84 Power Monitor and set switches to disable
power monitoring in the CE shelf. A QPC84 Power Monitor vintage
S or later is required. Refer to Circuit card installation and testing
(553-3001-211) for switch setting information.
Install the QPC84S Power Monitor.
Preparing the MS system for upgrade
1
Set the CAB INP circuit breaker on the QSP43 power control shelf in the
QCA109 cabinet and all other shelf circuit breakers to OFF.
2
Set the AC input circuit breaker on the –48V rectifier in the QCA109
cabinet to OFF.
3
Tag and disconnect cables from connectors on the faceplate of the
following cards located on the CE shelf:
QPC425 CPU/SDI card
QPC376 network cards
QPC139 SDI cards, if equipped
4
Remove cards from the CE shelf and store them in a safe place.
5
Tag and disconnect the tape unit alarm connector. To do this, you must
first remove the tape unit and then disconnect the alarm connector.
6
The CE shelf will not be used after the upgrade is completed. You may
remove it now if you wish:
Tag and disconnect all alarm connectors from the harness to the CE
shelf.
Unplug all power converter cards and all CE cards from the CE
shelf.
Tag and disconnect power connections and power monitor
connector C12 from the cabinet power distribution harness to the
right end of the backplane on the QSP39 shelf.
Note: If the cabinet is equipped with an expansion CE shelf (a second
CE shelf), disconnect and remove the wiring between the +5V, +12V,
–12V, and LGND connections on the CE shelf.