Nortel Meridian 1 Manual page 181

Upgrade system installation through x11 release 21
Table of Contents

Advertisement

4-102
SL-1 ST and STE system upgrades
553-3001-250 Standard 14.00 August 1996
Remove any diskettes from the floppy drive, and type
<a>
When you have rebooted the system, proceed with the next step.
13 After the system initializes, set the ENB/DIS switch to ENB on the
NT6D65 CNI card in Core/Net 0.
14 On the NT6D66 CP card in Core/Net 0, press and release the MAN RST
button. When "SYS700" messages appear on the LCD display, set the
NORM/MAINT switch to NORM. Within 60 seconds, the following
messages will appear on the LCD display:
RUNNING ROM OS
ENTERING CP VOTE
Within 10 minutes, an HWI533 message from the Core 1 CPSI port
indicates the Core 0 memory is shadowed to the Core 1 memory. Wait
until the memory synchronization is complete before continuing.
15 Set the NORM/MAINT switch to NORM on the CP card in Core/Net 1
and perform a redundancy sanity test:
LD 135
STAT CNI
STAT CPU
TEST CPU
TEST CNI c s to test the CNI on the inactive side
Note: Testing the CP and CNI cards may take 90 seconds or more for
each test.
16 Test the inactive Core, then switch Cores and test the other side:
SCPU
TEST CPU
17 Get the status of the CP cards and memories and of the CNIs:
STAT CPU
STAT CNI
****
to reboot the system
to load the program
to get the status of all configured CNIs
to get the status of both Cores
to test the inactive CP card and CP-to-CP cable
to switch to Core 0
to test the inactive CP card and CP-to-CP cable
to get the status of both Cores
to get the status of all configured CNIs
to exit LD 135

Advertisement

Table of Contents
loading

Table of Contents