Turning On The Power And Configuring The System - Nortel Meridian 1 Manual

Upgrade system installation through x11 release 21
Table of Contents

Advertisement

5
Install one PRI/DTI card in this module as the primary clock reference,
and install the rest of the PRI/DTI cards in the peripheral cabinet CE
shelf. For installation procedures, refer to Circuit card installation and
testing (553-3001-211).
6
Verify that PRI/DTI cards in the SL-1 peripheral cabinet CE shelf are
connected to the MDF or network interface.
7
Connect all external cables from the MDF to IPE shelf connectors in
cabinet I/O panels and IPE module I/O panels. Refer to Meridian 1
system installation procedures (553-3001-210) for the installation
procedures for the IPE module I/O panel external cable.

Turning on the power and configuring the system

Before you power up the system, review installation steps and verify that all
cards are in the appropriate card slots and properly cabled.
Note: Make sure a terminal is connected to J25 on the I/O panel in
Core/Net 1. If you are using only one terminal or a switch box for the
CPSI ports, set the connection to Core/Net 1. Verify that the terminal is
set for 9600 baud, 7 data bits, 1 stop bit, space parity, full duplex, XON
protocol.
1
In Core/Net 1, set the MAINT/NORM switch on the NT6D66 CP card to
MAINT.
2
In Core/Net 0, set the ENB/DIS switch on the NT6D65 CNI card to DIS.
3
Perform the appropriate step to restore power in each Core/Network
module:
For AC-powered systems, simultaneously set the MPDU in both
Core/Network modules to ON (up position).
For DC-powered systems, simultaneously set the switch on the
module power supply in both Core/Network modules to ON (up
position).
4
In Core/Net 0, set the MAINT/NORM switch on the NT6D66 CP card to
MAINT.
Upgrade system installation Upgrading to Meridian 1 system options
SL-1 ST and STE system upgrades
4-97

Advertisement

Table of Contents
loading

Table of Contents