Nortel Meridian 1 Manual page 803

Upgrade system installation through x11 release 21
Table of Contents

Advertisement

Table 12-5
NTND14 Core/Net 0-to-CNI cable label assignments
Cable number
NTND14BA
NTND14BA
NTND14BA
NTND14BA
NTND14BB
NTND14BB
NTND14BC
NTND14BC
NTND14BD
NTND14BD
Note: The upgrade package provides cables for only two network groups.
Additional NTND14 cables of appropriate length must be ordered separately for any
additional groups.
Preliminary tasks
Before you replace the option 71 CPU card cages with option 81 Core card
cages, perform the following steps.
1
Log into the system.
2
Load the Equipment Data Dump Program (LD 43). At the prompt, enter
LD 43
Always enter LD 43 from the source (current) media.
3
When "EDD000" appears on the terminal, enter
EDD
Upgrade system installation Upgrading to Meridian 1 system options
Upgrades to Meridian 1 option 81
CPU0-CNI-8D to 3PE-GRP0/0-J3
CPU0-CNI-8F to 3PE-GRP0/0-J4
CPU0-CNI-9A to 3PE-GRP1/0-J3
CPU0-CNI-9C to 3PE-GRP1/0-J4
CPU0-CNI-9D to 3PE-GRP2/0-J3
CPU0-CNI-9F to 3PE-GRP2/0-J4
CPU0-CNI-10A to 3PE-GRP3/0-J3
CPU0-CNI-10C to 3PE-GRP3/0-J4
CPU0-CNI-10D to 3PE-GRP4/0-J3
CPU0-CNI-10F to 3PE-GRP4/0-J4
to load the program
to begin the data dump
Label both ends
12-39

Advertisement

Table of Contents
loading

Table of Contents