11 Load the Equipment Data Dump Program (LD 43). At the prompt, enter
LD 43
12 When "EDD000" appears on the terminal, enter
EDD
13 When "DATABASE BACKUP COMPLETE" or "DATADUMP
COMPLETE" appears on the terminal, enter
****
If the data dump is not successful, do not continue; contact your
technical support organization. A data dump problem must be
corrected before proceeding.
Converting the ST/STE system hardware
Continuing with the upgrade will disrupt system operation. Minimal
service can be maintained if a power failure transfer unit (PFTU) is
installed.
1
Set the ENB/DIS switches on all cards in the ST/STE system to DIS.
2
Set all shelf circuit breakers to OFF.
3
Disconnect all network loop cables connected to the QPC414 Network
cards and cables connected to the SDI cards.
4
Set the CAB INP circuit breaker at the front of the cabinet to OFF.
5
Disconnect AC power for the cabinet by setting the commercial AC
power supply circuit breaker at the service panel to OFF.
6
Disconnect and remove any remaining cables connected to cards in the
CE shelf.
Upgrade system installation Upgrading to Meridian 1 system options
SL-1 ST and STE system upgrades
to load the program
to begin the data dump
to exit the program
CAUTION
CAUTION
4-69