Nortel Meridian 1 Manual page 845

Upgrade system installation through x11 release 21
Table of Contents

Advertisement

Table 12-15
QPC441F 3PE Card—Option settings
D20 switch: Core 1
1
2
3
off
on
on
off
RN27 jumper at E35:
NT6D60 Core Module
All other modules
40 Shut down power to the Core 0 module again. For AC-powered systems,
set the main breaker for the column to OFF (down position). For
DC-powered systems, set the switch on the power supply and the
pedestal breaker for the module to OFF (down position).
41 Attach the QMM42 Security Data Cartridge (provided with the software
upgrade package) to the IOP/CMDU card. Plug the cartridge into the
connectors on the card and install the screw that secures the cartridge.
42 Place the IOP/CMDU card in slot 16 (the card occupies two slots), but
leave the card unseated.
43 Set the NORM/MAINT switch on the CP Card to MAINT. Place the CP
Card in slots 14 and 15 (the card occupies two slots), but leave the card
unseated.
44 Place an NT6D65 CNI Card in slot 8, but leave the card unseated.
45 Place other CNI cards in slots 9 through 12 (starting with slot 9) as
required for the network group configuration, but leave the cards
unseated.
46 Check the vintage of the QPC441 3PE Card—it must be minimum
vintage F. Set the option switches and jumper on the card (see
Table 12-15). Place the card in slot 7, but leave the card unseated.
47 Place the clock controller card in slot 6, but leave the card unseated.
4
5
6
7
off
on
off
set to A
set to B
Upgrade system installation Upgrading to Meridian 1 system options
Upgrades to Meridian 1 option 81
Core 0
8
1
2
3
off
off
on
on
4
5
6
7
off
off
on
off
12-81
8
on

Advertisement

Table of Contents
loading

Table of Contents