Nortel Meridian 1 Manual page 730

Upgrade system installation through x11 release 21
Table of Contents

Advertisement

3
Load overlay 22 and print the Configuration Record to verify the above
changes:
LD 22
REQ PRT
TYPE CFN
****
After verifying the changes, enter
****
4
Load the Equipment Data Dump Program (LD 43). At the prompt, enter
LD 43
When "EDD000" appears on the terminal, perform the data dump. At the
prompt, enter
EDD
When "DATABASE BACKUP COMPLETE" or "DATADUMP
COMPLETE" appears on the terminal, proceed to the next step.
If the data dump is not successful, do not continue; contact your
technical support organization. A data dump problem must be
corrected before proceeding.
5
Set the ENB/DIS switch to ENB on the clock controller card in
Core/Net 0.
6
Set the ENB/DIS switch to ENB on the CNI card in Core/Net 0.
7
Set the ENB/DIS switch to ENB on the clock controller card in
Core/Net 1.
8
Set the ENB/DIS switch to ENB on all of the cards in the network area
of the Core/Network modules in both shelves.
Upgrade system installation Upgrading to Meridian 1 system options
Meridian 1 option 61 upgrades
to load the program
to set the print Option
to print the configuration
to exit the program
to exit the program
to load the program
to begin the data dump
CAUTION
10-57

Advertisement

Table of Contents
loading

Table of Contents