Nortel Meridian 1 Manual page 788

Upgrade system installation through x11 release 21
Table of Contents

Advertisement

12-24
Upgrades to Meridian 1 option 81
553-3001-250 Standard 14.00 August 1996
7
Power cycle the CP card in Core 1 as follows: Press the MAN RST
button and then immediately disengage the lock latches and unseat the
card from the backplane. Wait 5 seconds, reinsert the CP card, and secure
the lock latches.
The system will automatically perform a sysload during which several
messages will appear on the system terminal.
Verify that the message "SYS702 48" appears on the terminal
during the sysload. (The "48" portion of the message indicates that
48MB of memory has been located.)
While the sysload is being performed, database conversion occurs.
Verify that the following message appears on the system terminal:
DATA CONVERSION
X11 RELEASE < old rls # > TO RELEASE 21.xx
8
Watch the terminal for system reload (SYS) and initialization (INI)
messages. Following this, Core 1 is operational. If the sysload or
initialization fails, refer to "Troubleshooting" on page C-1.
9
Set date and time:
LD 2
STAD
10 Configure the system with the new memory configuration:
LD 17
11 For each prompt, type the following response:
REQ
TYPE
12 Press the RETURN key until the "MCFN" prompt appears and enter:
MCFN
Note: Be sure to insert one space between the values when typing.
13 Press the RETURN key until the "REQ" prompt appears and then enter:
REQ
to load the overlay
DD MM YY HR MN SC
to load the overlay
CHG
CEQU
4 4 4 4 16 16
****

Advertisement

Table of Contents
loading

Table of Contents