Nortel Meridian 1 Manual page 964

Upgrade system installation through x11 release 21
Table of Contents

Advertisement

12-200
Upgrades to Meridian 1 option 81
553-3001-250 Standard 14.00 August 1996
7
Clear displays, major alarms, and minor alarms:
CDSP
CMAJ
CMIN ALL
SCPU
CDSP
****
8
Remove any remaining cables that are no longer used.
9
Verify the system by using test procedures described in Meridian 1
system installation procedures (553-3001-210) and X11 input/output
guide (553-3001-400). Clear any faults discovered during testing.
10 Perform the post-conversion procedure as outlined in Software
conversion procedures (553-2001-320).
The XT Core and Network Module upgrade to option 81 is complete.
to clear the display
to clear all major alarms
to clear all minor alarms
to switch to the other Core
to clear the display
to exit LD 135