Before beginning an upgrade, make sure there is sufficient room to position
the new Meridian 1 column(s). Make sure the floor can handle the additional
weight of the new column(s), and make sure a sufficient power source is
available and can be accessed by the new column(s).
Note: Specifications for Meridian 1 column(s) are provided in
Meridian 1 installation planning (553-3001-120). Specifications for
Meridian 1 power requirements are provided in Meridian 1 power
engineering (553-3001-152).
Check the contents of the upgrade package, including all circuit cards and
cables. Make sure all of the items on the order form are on the packing slip
that comes with the equipment. Check the tool list in this document. Check
that all the tools you will need are on hand.
1
The Core Module upgrade is physically compatible with QCA55 and
QCA108 cabinets only. Systems with other cabinet types must install
Meridian 1 Core and Network Module columns to upgrade to option 81.
2
There must be one or more mounting locations available on the top of the
QCA55 and QCA108 cabinets for the connector housings used for core
to network cabling:
For a one-group system, one mounting location is required on top of
the QCA55.
For a two or three group system, two mounting locations are
required on top of the QCA55.
For a four or five group system, one more mounting location is
required on top of the QCA108, for a total of three connector
housings (two on the QCA55 and one on the QCA108).