-Removal (cont'd)
23. Remove the EGR pipe and the intake manifold as-
sembly.
NOTE: Fill the cylinder head intake ports with clean
shop towels to prevent foreign materials from get-
ting into the cylinders.
EGR PIPE
MOUNTING BOLT
8x 1.0 m m
9 lb-W
EGR PIPE
GASKET
Replace.
PCV HOSE
Remove.
8x 1.25 m m
1 8 lb-W
INTAKE MANIFOLD
GASKET
Replace.
4
(No.4 CYLINDER)
I
TA SENSOR
\
INJECTOR
I
CONNECTOR
8x 1.0
mm
(No.1 CYLINDER)
9 lb-ftl
GROUND
CABLE