Setting Connection Destination - Mitsubishi Electric M800VW Series Manual

Plc development
Hide thumbs Also See for M800VW Series:
Table of Contents

Advertisement

M800V/M80V Series PLC Development Manual
5 Peripheral Development Environment (GX Works2)
5.4 Preparation

5.4.2.5 Setting Connection Destination

The connection target must be specified before performing online operations from GX Works2 to the CNC controller.
The following TCP connection method is supported when connecting with Ethernet.
[TCP protocol: Connection type]
Used with typical networks. TCP is highly reliable (it requests re-transmission when data are lost), but not optimized for timely
delivery because of a large volume of communication it handles.
Start the setting screen by the following operation in the navigation window on GX Works2.
Select [Connection Destination], then double-click [Current Connection].
73
IB-1501614-B

Advertisement

Table of Contents
loading

This manual is also suitable for:

M800vs seriesM80vw seriesM80v seriesM850vwM830vwM850vs ... Show all

Table of Contents