Mitsubishi Electric M800VW Series Manual page 137

Plc development
Hide thumbs Also See for M800VW Series:
Table of Contents

Advertisement

M800V/M80V Series PLC Development Manual
5 Peripheral Development Environment (GX Works2)
5.5 Common Items
(4) End of trace
Trace is executed for the preset times of trace after the execution of trigger, the "Trace Data Storage Status" screen is
closed, and trace is completed. After that, trace results are automatically read to GX Works2 and displayed as follows.
Click the [Switch Chart/Detail] button
For details on how to evaluate trace result, refer to "19.4 Sampling Trace in GX Works2 Operating Manual (Common)".
(5) End trace screen
Even when the "Sampling Trace" screen is closed, or GX Works2 is ended while trace is being executed, trace is
executed. Restart GX Works2, open the "Sampling Trace" screen, click [Read from PLC] to read the result of trace
executed.
Displaying trace results
When the "Sampling Trace" screen is closed, or GX Works2 is ended while trace is being executed, manually read trace
results from the CNC controller.
(1) Start GX Works2, click [Debug] - [Sampling Trace] - [Open Sampling Trace] to open the "Sampling Trace" screen.
(2) Click [Debug] - [Sampling Trace] - [Read from PLC].
IB-1501614-B
to display detailed data.
112

Advertisement

Table of Contents
loading

This manual is also suitable for:

M800vs seriesM80vw seriesM80v seriesM850vwM830vwM850vs ... Show all

Table of Contents