M800V/M80V Series PLC Development Manual
5 Peripheral Development Environment (GX Works2)
5.16 Displaying Project Verification Result in Ladder Diagram (GX Works3)
5.16.1 Operation Procedure
(1) Save two GX Works2 project data that are the verification targets.
(2) On GX Works3, read the GX Works2 project data that are the verification targets by the following operation.
Select [Project] - [Open Other Format File] - [GX Works2 Format] - [Open Project].
Select GX Works2 project data that is the verification targets.
Click [OK] in the dialog to confirm the change.