Operation Procedure - Mitsubishi Electric M800VW Series Manual

Plc development
Hide thumbs Also See for M800VW Series:
Table of Contents

Advertisement

M800V/M80V Series PLC Development Manual
5 Peripheral Development Environment (GX Works2)
5.16 Displaying Project Verification Result in Ladder Diagram (GX Works3)

5.16.1 Operation Procedure

(1) Save two GX Works2 project data that are the verification targets.
(2) On GX Works3, read the GX Works2 project data that are the verification targets by the following operation.
Select [Project] - [Open Other Format File] - [GX Works2 Format] - [Open Project].
Select GX Works2 project data that is the verification targets.
Click [OK] in the dialog to confirm the change.