Mitsubishi Electric M800VW Series Manual page 187

Plc development
Hide thumbs Also See for M800VW Series:
Table of Contents

Advertisement

M800V/M80V Series PLC Development Manual
5 Peripheral Development Environment (GX Works2)
5.7 Developing Structured Project
 How to check conversion step with an error number
Error steps can be checked using PLC verify function.
For details on PLC verify function, refer to "5.7.7 Verifying the Sequence Programs".
Verify Source: Select transfer source ladder file on GX Works2
Verify Destination: Select ladder with an error file "ERRLD-00" in the CNC controller
When PLC verification is executed, the verify result screen is displayed. When a file name is double-clicked, mismatched
contents are displayed as shown in the example below. The NOP instructions on the CNC controller are the steps with
conversion errors.
Double-click one of them to display and edit the corresponding part on the GX Works2 file.
"<Verify Source>" indicates the GX Works2 side, and "<Verify Destination>" the CNC controller side.
Result with error is displayed in red
CNC controller
GW Works2
IB-1501614-B
162

Advertisement

Table of Contents
loading

This manual is also suitable for:

M800vs seriesM80vw seriesM80v seriesM850vwM830vwM850vs ... Show all

Table of Contents