Initiating Frame Relay Backup Switchover/Switchback
16-18
Frame Relay backup DLCIs can be configured (as described in Chapter 6) to automat-
ically become operational a set time after failure of a primary DLCI, and to switch
back to the primary a set time after the primary becomes operational again. These
automatic settings can be overridden via Frame Relay Backup Operations (
from the Main Menu).
From the Frame Relay Backup Operations Menu:
To switch from a primary to one of its backups, press
To switch from a backup to a primary, press
In either case, enter (as prompted) the requested information to identify the primary
and backup.
[A]
.
.
[B]
FRX/FRM 3.3 User Guide, Rev 04
[B], [J]
Need help?
Do you have a question about the SmartSwitch 6000 and is the answer not in the manual?