Engine Installation - Honda NSS250S Manual

Hide thumbs Also See for NSS250S:
Table of Contents

Advertisement

ENGINE INSTALLATION

• Before installing the engine, route the wires, hoses, and cables properly (page 1-21).
59 N·m (6.0 kgf·m, 44 lbf·ft)
ENGINE HANGER BRACKET
Coat new O-rings with molybdenum disulfide paste
and install them to the engine mounting bushing
grooves.
Apply 0.50 – 0.70 g (0.018 – 0.025 oz) of molybde-
num disulfide paste to the center groove of the
engine mounting bushings and install them.
Loosely install the engine hangar bracket, bolts and
nuts.
maxiscooter-club.ru
COLLAR
O-RINGS
BUSHINGS
ENGINE REMOVAL/INSTALLATION
20 N·m (2.0 kgf·m, 15 lbf·ft)
59 N·m (6.0 kgf·m, 44 lbf·ft)
O-RINGS
BUSHINGS
NUTS/BOLTS
ENGINE HANGER BRACKET
TENSION ROD
59 N·m (6.0 kgf·m,
44 lbf·ft)
O-RINGS
8-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nss250a

Table of Contents