Inspect the
inner bushings for wear or
dall1aae.
ENGINE REMOVALllNSTALLATION
Remove the engine
er.
bolt, stopper rubber bolt and
•
Route the wire and cables
(page 1-8).
•
Fill the crankcase and final reduction to the proper level
with the recommended oil
2-11.
•
Fill the
system
12-21.
•
Perform the
inspection and adjustment.
- Throttle operation (page 3-41.
Rear brake pedal free play
3-1 2).
ENGINE INSTALLATION
Install the engine in the reverse order of removal.
Apply molybdenum disulfied grease
to
the new
stall them the
inner
bu~;hirlgs.
NOTE
TORQUE VALUES:
bolt:
100-120
N·m
(10.0-12.0
kg-m,
72-87 ft-Ibl
Engine hanger joint bolt: After '85:
40-55
N-m
(4.0-5.5 kg-m, 29-40 ft-Ibl
mounting bolt:
40-55 N-m (4.0-5.5 kg-m, 29-40
ft-Ibl
Rear shock absorber mounting bolt:
24-30 N·m 12.4-3.0
17-22 ft-Ibl
hanger stopper rubber bolt:
24-30 N·m 12.4-3.0
17-22 ft-Ibl
and in-
5-5