FUEL SYSTEM (PGM-FI)
INSTALLATION
Install the throttle body to the insulator by aligning
its lug with the slot in the insulator.
Connect the connecting boot to the throttle body
and tighten the connecting boot band screw to the
specified torque.
TORQUE: 1.0 N·m (0.1 kgf·m, 0.7 lbf·ft)
Tighten the insulator band screws to specified
torque.
TORQUE: 5 N·m (0.5 kgf·m, 3.7 lbf·ft)
Connect the sensor unit 5P (Black) and IACV 4P
(Black) connectors.
Install the clamp to the stay.
Connect the throttle cables to the throttle drum.
Adjust the throttle grip freeplay (page 4-5).
Install the luggage lower box (page 3-16).
6-84
maxiscooter-club.ru
Align
THROTTLE BODY
CONNECTING BOOT
BAND SCREW
INSULATOR BAND SCREW
5P (Black) CONNECTOR
4P (Black) CONNECTOR
LOCK NUTS
THROTTLE CABLES
CLAMP